MRP Software

    What to buy, what to make, exactly when

    MRP that runs itself. Likwid turns your demand forecast into a plan — explodes every BOM, nets it against live stock, time-phases each order to its lead time, and releases the buys and builds — on top of the ERP you already run.

    Works with
    SAPOracleOdooMicrosoft Dynamics

    MRP run · SA-100

    lead time 2 wks · lot 40

    Plan ready
    BucketW1W2W3W4W5
    Gross requirement—120—20080
    Scheduled receipts100————
    Projected on-hand160404000
    Planned release—16080——
    2 planned orders · released to purchasing & the floor
    The problem

    Too much of one thing, none of another

    Planning material by hand always lands in the same place: cash tied up in the wrong inventory, and a line stopped for the one part nobody saw running short — the real reason planners get off Excel.

    01

    Stockouts stall the line

    A single missing component halts a whole build — because the shortfall wasn't seen until the work order hit the floor.

    02

    Excess inventory everywhere

    To avoid stockouts, everything gets over-ordered 'just in case' — and working capital sits dead on the racks.

    03

    BOM-to-plan is manual

    Exploding bills of materials and netting them against stock happens in Excel, by hand, and is stale the moment it's saved.

    04

    No sense of timing

    Even when quantities are right, orders land too early or too late, because nothing offsets requirements by real lead times.

    BOM explosion

    One order becomes every part

    Build a hundred pumps and Likwid walks the bill of materials all the way down — sub-assemblies, components, raw material — with the right quantity at every level, so nothing is missed and nothing is double-counted. It's the material backbone beneath every production schedule.

    Pump P-200build × 100Housing× 100Motor× 100Impeller× 100Casting× 100Bolts M8× 800Rotor× 100Bearing× 200

    Exploded

    7 levels · 240 parts

    The MRP run

    From demand to released orders

    The five steps of a run, done automatically — each planned order handed to procurement as a purchase order. Tap any to hold it.

    DemandBOMStockMRP

    Pull in demand, BOMs and stock

    Sales orders, forecasts, every bill of materials and live inventory flow in — the plan starts from one connected picture, not scattered sheets.

    Chess pieces on a board

    Plan three moves ahead of the floor

    Good material planning is a game of timing — every part in position before the build needs it. Likwid keeps the whole board in view and re-plans the moment a piece moves — agentic MRP that thinks for itself.

    Multi-level

    BOMs exploded in full

    Continuous

    re-planning, not batch

    Netted

    to the real shortfall

    Why Likwid

    MRP that stays current

    Re-plans continuously

    Demand shifts or a receipt slips and the whole plan updates itself — not a monthly batch run that's obsolete by week two.

    Nets to the real shortfall

    On-hand and on-order are subtracted first, so you buy and make only what's genuinely short.

    Works on top of your ERP

    It reads BOMs, stock and orders from SAP, Oracle, Odoo or Tally and writes the plan back — no rip-and-replace.

    FAQ

    MRP software, answered

    What planners ask before they let MRP run itself.

    MRP (material requirements planning) software works out what to buy and make, in what quantity and when, to meet production. It explodes each product's bill of materials, nets the requirement against stock and open orders, time-phases everything to lead times, and releases planned purchase and work orders. Likwid does all of it automatically on top of your existing ERP.

    Reorder points look at one item in isolation. MRP is demand-driven — it starts from what you're actually building, explodes the full multi-level BOM, and plans every component and raw material together, offset by its own lead time.

    Yes. Likwid explodes bills of materials through every level — finished good to sub-assembly to component to raw material — and plans each with its own lead time, lot size and on-hand.

    Continuously. When demand changes, a receipt slips or stock moves, the plan updates itself rather than waiting for a monthly MRP batch that's out of date almost immediately.

    Yes — Likwid is ERP-agnostic. It reads BOMs, inventory and orders from your existing system and writes planned orders back. No rip-and-replace, and typical go-live is a few weeks.

    Yes. The plan becomes real purchase orders for bought items and work orders for made items, released to procurement and the shop floor with a full audit trail.

    See an MRP run on your own BOMs

    A 30-minute walkthrough: import a product and its BOM, net against your stock, and watch the planned orders fall out.

    Talk to us

    See Likwid on your own data

    Leave your details and we'll set up a 30-minute walkthrough on your numbers — no slides. We reply within a day.

    Prefer email? admin@likwid.co.in